Confirm voltage, frequency, phase, grounding and local electrical protection.
Delivery and service
Heavy custom furnace equipment needs shipment planning and site readiness before arrival.
The delivery conversation should start before production finishes, especially for unloading, utilities, commissioning and operator training.
Technical fit, commercial clarity, export documents and installation readiness are handled before the buyer asks only for the lowest price.
Checklist
Site readiness before commissioning.
Use this list before the equipment arrives.
Prepare cooling water, compressed air, process gas, exhaust and vacuum pump area when required.
Confirm door size, crane or forklift capacity, floor loading and installation clearance.
Nominate operators, safety owner and engineer contact for commissioning.
Define no-load test, temperature check, alarm check and handover record.
Keep spare parts, remote service channel and warranty follow-up date in the CRM.